Castle Hill Trusses

LJT worked with the structural engineer and builder on this project extensively during the design phase to ensure the prefabricated elements met the methodology and design intent. The completed home was constructed in a remote location, so a fully prefabricated methodology was chosen including SIP panels, which went up in under 3 days. The trusses were and integral part of that, and were pre – assembled including coatings, to be installed on site.

 

Location: Castle Hill

Industry: Residential

Type of Project: Australian Hardwood Feature Trusses